|
 |
| overview |
Wave 1st Silver Tower is developed by Wave Infratech, venture of Wave Inc. (formerly known as The Chandha Group) who brought in a whiff of fresh air in the residential and commercial segment in NCR. The project is strategically located at the intersection of major access roads of sector 18 market Noida. The Centrestage Mall, Ware Cinemas, Elevate are names to reckon with in real estate in Noida. Under the banner of Wave Infratech, the group has established a chain of Malls "The WestEnd Mall", successfully operational at Kaushambi, Lucknow, Ludhiana, Moradabad. Wave Inc. (formerly The Chadha Group) is a reputed industrial house in northern India with diverse interest in sugar manufacturing, paper manufacturing, liquor retailing etc., in addition to construction business and having a significant annual turnvoer of approx Rs. 2500 Crores.
The objective of the group is to contribute towards building of much needed infrastructure in the country, and today the Group has become synonymous with architectural brilliance and innovation with the essence of quality. |
| |
| features |
| |
• |
State-of-the-art office space. |
• |
Located in the heart of satellite city Noida. |
• |
Stone throw from Noida Sector 18 metro station. |
• |
Exudes contemporary and chic characteristic. |
• |
Architecture speaks of contemporary disign with detailing of high standards. |
• |
Maximize daylight in work environment with the use of windows. |
• |
The use of operable windows facilitates natural ventilation, reducing
operational costs within the work environments. |
• |
With a floor plate of over 20,000 sq.ft the office size vary from 400-1000sq.ft. |
• |
Maximum visibility to retail area with maximum scope for branding. |
• |
A beautiful green landscaped pedestrian for enhanced visualization of the building and high street shopping. |
• |
Vertical show windows give a grandeur to the whole commercial complex. |
• |
Curtain glazing to give transparency and clarity to the activities happening inside the complex. |
• |
Ground floor shops with double height for more branding space. |
• |
Great visibility from sector 18 for better branding opportunity. |
• |
Well designed, energy efficient façade. |
• |
Low Maintenance Cost |
|
| |
| specifications |
| Shop Specifications and Common Facilities at Wave 1st Silver Tower |
|
|
| Air Conditioning |
100% air-conditioning for the shop(s)Chilled water pipe line up to shop level for central air-conditioning plant hook up |
| Main Power |
Main supply from UPSEB100% captive standby power supply |
| Water |
Potable water supply to Restaurant(s) and at common areas on chargeable basisOverhead storage tanksWater treatment / filtration systemPotable drinking water supply at single point one each floor for Allottee(s) / Occupier(s) |
Fire Fighting |
Sprinkler systemHydrants with hose realSmoke detectors connected to central fire panel |
Lighting System |
All public areas shall be well lit with energy efficient fixtures |
Public Address System |
For announcement (s) / paging at / near the information center |
Structure |
RCC column and slab with brick work masonry |
Flooring |
Entrance lobby will be in suitable tile flooringCorridor at shopping level will be in suitable tile flooring |
Piped Music |
Piped music at shopping floor / common areas |
Other common facilities |
Well laid out toilets with automatic flush valve |
Telephone / Lines |
a 2 pair telephone line point upto each shop |
Exterior finish of the building |
Curtain wall plaster / paint finish |
Shop Front |
Aluminum framed glazing with one door at the front of each shop. |
|
Office Space Specifications and Common Facilities at Wave 1st Silver Tower |
|
|
Air Conditioning |
Air-conditioning will not be provided in common areas
Spilt air-conditioning will be provided inside the unit. |
Main Power |
Main supply from UPSEB
100% captive standby power supply as per chart |
Water |
Water supply in each unit on chargeable basis
Overhead storage tanks |
Fire Fighting |
Sprinkler system
Hydrants with hose real
Smoke detectors connected to central fire panel |
Lighting System |
All public areas shall be well lit with energy efficient fixtures |
Structure |
RCC column and slab with brick work masonry |
Flooring |
Entrance lobby will be in suitable tile flooring
Corridor at Office Space level will be in suitable tile flooring |
Piped Music |
Piped music at Office Space floor / common areas |
Other common facilities |
Well laid out toilets with automatic flush valve |
Telephone / Lines |
2 pair telephone line point upto each Office Space |
Exterior finish of the building |
Curtain wall plaster / paint finish |
Office Front Space |
Aluminum framed glazing with one door at the front of each Office Space. |
|
| |
| Layout Plan |
|
|
|
|
| |
| |
| floor plans |
|
| Payment Details |
› |
Construction Link Payment Plan ( Already due payment- 35%) |
| |
• |
Booking Amount |
15% |
• |
On Laying of Basement Slab |
10% |
• |
On Casting of Ground Slab |
10% |
• |
On Laying of Third Floor |
10% |
| |
• |
On Laying of Fifth Floor |
10% |
| |
• |
On Laying of Seventh Floor |
10% |
| |
• |
On Laying of Ninth Floor |
10% |
| |
• |
On Laying of Eleventh Floor |
10% |
| |
• |
On Completion of Brick Work & Internal Plaster |
10% |
| |
• |
On Offer of Possession |
5% + Other Charges |
› |
II.Time Linked Payment Plan |
| |
• |
Booking Amount |
20% |
• |
In Bimonthly equal installments |
75% |
• |
On Offer of Possession+ Others |
5% + Other Charges |
› |
III.Cash Down payment plan(Discount offered - 7.5%) |
| |
• |
Booking Amount |
15% |
• |
Within 45 Days of Booking |
80% |
• |
On Offer of Possession |
5% + Other Charges |
|
|
|
| Contact Us |
|
|
| |
|
|
|
|
|